The project initially was to be completed in September but for the COVID-19 pandemic, the project was delayed and postponed.
The flyover which is said to be at 60 per cent completion stage, took off from Oba Ogunji Road and drops at Oke Koto axis of Agege.
The third section of the bridge extends to old Abeokuta Highway into Abule Egba.
The total length of the bridge is 1.4 kilometres and it is expected to have streetlight facilities and pedestrian walkways.
AutoReportNG got some live images from the site and how the work looks like, please check below
No comments:
Post a Comment